Digital Monitoring Products Canadian XR100 Guía de instalación Pagina 26

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 36
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 25
Digital Monitoring Products XR100 Series Canadian Installation Guide
20
ComplianCe
Listed Compliance Specications
19.1 Introduction
For applications that must conform to a local authorities installation standard or a National Recognized Testing Laboratory
certicatedsystem,pleaseseethefollowingsections.
Burglary Specications
20.1 Introduction
TheprogrammingandinstallationspecicationscontainedinthissectionmustbecompletedwheninstallingtheXR100
SeriesCanadianpanelinaccordancewithanyoftheburglarystandards.Additionalspecicationsmayberequiredbya
particularstandard.SeetheXR100SeriesCanadianProgrammingGuide(LT-0896CAN).
20.2 Control Outside of Protected Area
APotterEVDorSentrol5402mustbeusedwhenthepanelisinstalledoutsideofthevaultinanancialapplication.Front
and rear tamper switches are required. Refer to the system wiring diagram.
20.3 Bypass Reports
The Bypass Reports option must be programmed as YES for all burglary applications.
20.4 System Maintenance
To ensure continuous satisfactory operation of any alarm system, proper installation and regular maintenance by
the installing alarm company and frequent testing by the end user is essential. Offering a maintenance program and
acquainting the user with the correct procedures for system use and testing is also the responsibility of the installing alarm
company.
ULC S304-06 Specications
Signal Receiving Center and Premise Burglar Alarm Control Units
21.1 For Low Risk Applications: Level A1
LevelA1communicationchannelsecurityisprovidedforInternet,Intranet,LANorWANnetworkswhenconguredasa
NET communicating system using the XR100N.
NET:
PRIMARY
SUB CODE: YES
CHECKINTIME: 2 MINUTES
FAIL TIME: 3 MINUTES
SEND COMM TRBL: YES
TCP COMM: YES
21.2 For Low Risk Applications: Level P1
LevelP1communicationchannelsecurityisprovidedwhenconguredasaDDcommunicatingsystemandadailytest
message using the XR100.
21.3 Dual Protection
For Medium or High Risk ULC Listed Applications: Use only zones 1-8 on the control panel and program Dual EOL as
Yes in panel programming. Program the Disarmed Short Message in Alarm Action of Zone Information programming as
a Trouble message.
Note:Ifusinga714,714-8,or714-16fordualprotection,programtwozonesasthesamenameorequivalentand
connect to the contact in the protected area as show in the Dual Zone Protection diagram in the back of this guide.
21.4 Remote Arming
For ULC Listed applications, remote arming is not permitted.
21.5 Zone Expansion
Use of the following zone expanders are permitted for connection of burglary devices:
710 Bus Splitter Module 714ZoneExpander,4zones 715ZoneExpander,4zones 7070(A)/7073(A)Keypads,4zones
711 Zone Expander, Single 714-8ZoneExpander,8zones 715-8 Zone Expander, 8 zones 7170/7173Keypads,4zones
712-8 Zone Expander, 8 714-16ZoneExpander,16zones 715-16 Zone Expander, 16 zones
Vista de pagina 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 35 36

Comentarios a estos manuales

Sin comentarios